Kingston upon Thames Society: Response to the Draft London Plan


Draft London Plan

Introduction

The Kingston upon Thames Society welcomes the opportunity to comment on the Draft London Plan published in July 2026. We support the aim of a shorter, plan-led framework and a brownfield-first approach. However, we have concerns in nine areas, set out below.

1. Local discretion and the Optimisation Framework (MBUL2)

The indicative minimum densities and height ranges risk overriding local character assessments and design codes that boroughs are still preparing. Kingston’s emerging Local Plan has been through extensive local engagement. The London Plan should state that robust local evidence on character, heritage and townscape takes precedence over the guideline ranges, not merely that they may be exceeded.

2. Tall buildings (MBUL3)

We support a genuinely plan-led approach to tall buildings under Policy MBUL3. However, the distinction between buildings of 30–100m and metropolitan tall buildings of 100m and above must not obscure the substantial effects that buildings in the lower category can have on Kingston’s historic townscape, the Old Town and the Thames riverside. Recent schemes in Kingston town centre show the harm that speculative height can cause.

MBUL3 already requires boroughs to identify appropriate locations, boundaries and heights through their local plans. Our principal concern is the development-management provision allowing proposals outside identified locations, or in the absence of local allocations. This risks undermining the plan-led approach. Such departures should be exceptional, subject to clearly defined tests, and should not establish a precedent for further height or a new cluster.

Boroughs should retain explicit scope to set locally justified height controls and assessment requirements below 30m where necessary to protect sensitive townscape and heritage settings. Neither good transport accessibility nor the Optimisation Framework should, by itself, establish that a site is suitable for a tall building.

We particularly support MBUL3’s requirement to protect the open quality of the Thames and avoid visual enclosure, canyoning and dominance. Assessment should address the cumulative effects of existing, consented and proposed development on the riverside, on local and strategic views, and on the settings of conservation areas and listed buildings, using agreed verified views and proportionate three-dimensional modelling.

The Plan should also make clear that existing or consented tall buildings do not, by themselves, justify further height, and that a designated tall-building location does not imply that its maximum height is acceptable on every site.

3. Heritage (MBUL7)

We support the new emphasis on adaptive re-use and retrofit of historic buildings. We ask that the policy restate the “great weight” to be given to conserving designated heritage assets and their settings, so that growth objectives do not dilute it.

4. Green Belt and Metropolitan Open Land (PV6 and PV7)

South Chessington appears on the indicative 20-year key diagram as a future residential-led candidate Broad Location for Growth in the Green Belt, and the M25 at South Chessington is shown as a ten-year industrial location. Any release should be tested through Kingston’s Local Plan, not presumed at strategic level, and should be conditional on committed transport and social infrastructure. We support keeping Metropolitan Open Land protection separate from the national grey belt regime.

Hook Park. If the South Chessington candidate location includes land at Hook Park, the Society objects to its inclusion. Much of Hook Park lies beyond walking distance of Chessington North station, even on the draft’s own 1,200m test. It could therefore only qualify through the bus route test, which requires a fast, frequent corridor with extensive bus priority and a predominantly dedicated right of way (Box PV7C), not an ordinary bus service. A corridor of that standard would be needed to both Chessington North and Surbiton, and none is identified, designed or funded in the draft Plan. In the Society’s view, Hook Park would not be a sustainable location even if Crossrail 2 were built, and Crossrail 2 itself has no funding decision or timetable (see section 5). We ask that Hook Park be excluded from the candidate location or, failing that, that the Plan state expressly that it cannot be treated as a sustainable location unless a PV7C-compliant bus corridor to both stations is committed. We also ask the GLA to publish the boundary of the South Chessington candidate location, which the key diagram does not define.

More broadly, Policy PV7 and Box PV7A, which set out when Green Belt land counts as a “sustainable location” for development, are in key respects more permissive than national policy. A strategic plan should not go further than the NPPF in loosening Green Belt protection. We ask for the following changes:

  • Walking distance to stations. Box PV7A treats a residential-led site as sustainable where the vast majority of new homes are within 1,200m, or 15 minutes’ walk, of a station. The August 2026 NPPF defines reasonable walking distance as around 800m, or around 10 minutes’ walk, and applies only to the parts of a site within that distance. A 1,200m catchment covers more than twice the area of an 800m one. The threshold should be 800m, and should apply to every part of a site, not to the “vast majority” of homes.
  • Bus routes. The alternative test of 400m from a qualifying bus route has no equivalent in national policy and could bring large areas of Green Belt within scope. It should be removed, or limited to high-frequency routes with secure long-term funding.
  • Data centres. Test (c) would allow data centres on any grey belt land. These are land-hungry uses that employ few people. They should be directed first to brownfield and designated industrial land, with Green Belt considered only where no such land is available.
  • Other employment uses. Test (d) lets employment uses qualify simply because a residential-led proposal nearby does. It should apply only where the employment use forms part of the same allocation or masterplan and is delivered alongside the homes.

The Plan also refers to “strategic exceptional circumstances that would justify strategic scale releases” without saying what those circumstances are. It should set them out, and require boroughs to show that brownfield and other reasonable options have been exhausted first. It should also state plainly that meeting the PV7A tests does not by itself establish exceptional circumstances.

5. Kingston, Crossrail 2 and the future candidate Opportunity Area

The 2021 Plan’s Kingston Opportunity Area depended on Crossrail 2. We welcome its removal from the list of designated Opportunity Areas and the recalibration of Kingston’s housing target to 687 homes a year on brownfield land. However, Kingston has not been dropped entirely. The key to Figure 2.1 lists Kingston (no. 87) as a “Future Candidate Brownfield First Opportunity Area”, and paragraph 6.9 says the Mayor may work with boroughs to identify new Brownfield First Opportunity Areas linked to emerging strategic transport projects, including candidates on the 20-year key diagram. For Kingston, that can only mean Crossrail 2.

This leaves Kingston in an uncertain position for the whole life of the Plan. Crossrail 2 was shelved in 2020 and has no funding decision or timetable; discussions with the Department for Transport have concerned only refreshing the route safeguarding. The draft’s own list of schemes supporting growth after 2037 names the West London Orbital, the Bakerloo Line Extension and metroisation, but not Crossrail 2. On the experience of Crossrail 1, even a funding decision at the end of this decade would be followed by 15 to 20 years of business case refresh, a hybrid Bill, construction and testing. That would put opening in the mid-2040s or later, at or beyond the end of the Plan’s 20-year horizon.

We recognise that the Mayor cannot commit the Government to a decision. We ask that the Plan:

  • set out the milestones on which any reactivation would depend: a refreshed safeguarding direction, a Government funding commitment, and Royal Assent for a hybrid Bill;
  • state that Kingston will be designated as a Brownfield First Opportunity Area only after a funding commitment or Royal Assent, and only through a formal review of the London Plan with public consultation, not through the discretion in paragraph 6.9;
  • commit to a partial review of the Plan within two years of any Crossrail 2 decision, whether positive or negative;
  • until then, make clear that no Opportunity Area-scale intensification is expected in Kingston, and that growth must be matched by deliverable transport, health and school capacity.

6. Plan period and housing beyond 2037

The Plan describes itself as a framework for London’s development over the next 20 years, but sets borough housing targets only for 2027/28 to 2036/37. No statute fixes the period a spatial development strategy must cover, so this is a policy choice. The August 2026 NPPF expects spatial development strategies to look at least 25 years ahead from adoption. If that applies to the London Plan, the draft falls short of it; if it does not, the Plan should explain why London should plan over a shorter horizon than the rest of England.

For the second decade, the Plan relies on a London-wide aim of at least 850,000 homes up to 2047, conditional on transport schemes that are unfunded or not yet designed. It is unclear whether this figure covers 2037–2047 alone or the whole 20 years, and no share is given to any borough. Boroughs are asked to plan for capacity they cannot quantify, and residents cannot tell what is expected of their area. We ask that the Plan:

  • clarify whether the 850,000 figure covers 2037–2047 alone or the full plan period;
  • publish indicative borough or sub-regional ranges for 2037–2047, with the infrastructure each depends on;
  • set out the triggers, such as transport funding decisions, that would bring future candidate locations, including Kingston and South Chessington, into the Plan, and commit to doing so only through a formal review.

7. Affordable housing (HN3)

The Society supports keeping the strategic 50% target. However, we are concerned that a 20% Fast Track threshold in outer boroughs such as Kingston will become the working norm rather than a minimum. That is a sharp fall from the 35% threshold in the 2021 Plan. Kingston has some of the highest house prices in outer London and a very limited social rented stock, so housing need here is acute. We ask that:

  • the Plan state explicitly that thresholds are the minimum for fast-tracking, not a target, and that boroughs may seek higher levels where local evidence supports it;
  • social rent be prioritised within the tenure mix, with a stated minimum proportion, since 20% of mixed tenure will deliver very few homes at social rent;
  • the Plan publish annual monitoring of affordable completions by band, with a trigger to review thresholds if delivery falls short.

8. Floor-to-ceiling heights and housing quality (HN8)

We object to reducing the minimum floor-to-ceiling height from 2.5m to 2.4m. The London standard exists because of the city’s higher densities, urban heat island effect and reliance on flats. Higher ceilings help with daylight, ventilation and cooling, and they matter more as summers get hotter.

Combined with the relaxed dual-aspect wording, the change risks a long-term decline in the quality of homes that will stand for a century. We ask that 2.5m be retained. If any reduction is kept, it should not apply to single-aspect or north-facing homes, or to homes in tall buildings.

9. Viability

Viability has too often been used to reduce affordable housing, design quality and infrastructure contributions after permission is granted. The Society asks that:

  • viability assessments be published in full, as a default, alongside applications;
  • benchmark land values reflect policy compliance, so that overpaying for land cannot justify lower affordable housing;
  • early and late-stage review mechanisms be kept and strengthened for all Viability Tested schemes, as the only way to capture value when markets recover;
  • design standards, including space and height standards, never be traded against viability;
  • the Plan’s viability evidence be refreshed before the Examination in Public, given the time before adoption.

Closing

The Society would welcome the opportunity to participate in the Examination in Public.

John Allen, Chair, on behalf of the Kingston upon Thames Society
October 2026 · chair@kts.org.uk

Last Updated on October 15, 2026 by Kingston Society