A short history journey around Kingston upon Thames and the town and surrounding areas public transport network


Wednesday 19th March 7.30pm at the Judge lecture Hall, Tiffins School.


London United Tramways Company Limited was the operator of trams and trolleybuses in the western and southern suburbs of London, UK, from 1894 to 1933

Parliament passed bills in 1930 & 1933 passing the operation of LCC’s existing bus and London Underground service and all of London’s tramways to the London Passenger Transport Board. Under the LPTB, there was no new investment in tram services and the maintenance of services became a hot political issue in elections in South London, an area poorly served by Underground trains. At this time, trams were starting to be considered out-dated and inflexible and the phasing-out and replacement by diesel buses or trolleybuses started in earnest around 1935, when a large proportion of the trams and of the tracks and ancillary equipment were nearing the end of their useful life
Retirement of the tramways in South & South Wast London including Kingston upon Thames started in October 1950 and concluded in June 1952.

Trolley Bus routes 601 to 605 ran from Kingston to a number of South & southwest London destinations. That network began life in 1931 when London United Tramways started replacing its tram routes in the area which the newly established London Transport Board inherited after it was formed just two years later in 1933. London Transport’s small trolleybus network centred on Kingston was withdrawn in May 1962.

Following the successful introduction of Croydon Tramlink in the 1990’s, a proposal sponsored by the Surrey Comet was published in the mid 1990’s to build a tramway to Kingston from Surbiton & New Malden along the route of the Hogsmill River, but the proposal was not successful.

Between 2002 and 2004 a more ambitious proposal was planned, the Kingston, Surbiton and Malden Rapid Transport Scheme [K-SMART], Linking the residential and commercial area of the Borough and Sutton. The sponsors included, RBK, TfL, Kingston Chamber of Commerce, Kingston Town Centre Management, Halcrow & Leewood Projects. The proposal did not meet the Treasury’s strict Cost Benefit Analysis funding model and was consigned to history

Share this post

Last Updated on February 21, 2025 by Kingston Society